    Case StudyAgricultural EquipmentBrandon, MB

    How Prairie Ag Cut Downtime by 60% With Same-Day Steel Processing

    A regional equipment manufacturer eliminated production bottlenecks by switching to Brunswick Steel's integrated stock-and-processing service.

    How Prairie Ag Cut Downtime by 60% With Same-Day Steel Processing
    60%
    Reduction in Production Downtime
    1 Day
    Average Lead Time (Was 5-7)
    $340K
    Annual Cost Savings
    100%
    On-Time Delivery Rate

    One Supplier, One Call, Next-Morning Delivery

    Brunswick Steel proposed consolidating Prairie Ag's entire steel supply chain — stock, processing, and delivery — into a single relationship. The key was Brunswick's in-house tube laser, which could cut and notch HSS tubing in hours rather than days.

    Prairie Ag started placing orders through BÔS, Brunswick's online ordering system, by 2 PM. Brunswick pulled stock, ran the tube laser and plate processing overnight, and had finished material on a truck by 6 AM the next morning.

    When engineering sent a revised cut list at 3 PM on a Tuesday, the updated parts were on Prairie Ag's floor by Wednesday morning. The five-day cycle collapsed to less than 24 hours.

    Production floor
    Prairie Ag production floor — tube frames staged for welding
    Tube laser cutting
    Brunswick tube laser cutting HSS for Prairie Ag order
    Brunswick tube laser cutting HSS for Prairie Ag order
    Brunswick tube laser cutting HSS for Prairie Ag order

    Five Days of Waiting for Every Production Run

    Prairie Ag Equipment builds grain handling and seeding equipment for farms across Manitoba and Saskatchewan. Their production floor runs on steel — tube, plate, angle, and flat bar — and every day without material is a day without output.

    Before Brunswick, Prairie Ag sourced steel from a Winnipeg distributor and sent it to a separate shop for cutting and processing. The round trip took five to seven business days. When engineering made a design change mid-run, the cycle started over.

    VP Operations Mike Makara estimated that material delays were costing the company 15 to 20 production days per quarter — roughly $85,000 in lost output each time.

    "The first time we got a revised order back the next morning, our welders thought there had been a mistake. They couldn't believe the turnaround."

    Mike Makara
    VP Operations, Prairie Ag Equipment

    60% Less Downtime, $340K in Annual Savings

    Within six months of switching to Brunswick, Prairie Ag saw production downtime caused by material delays drop by 60%. The annual cost savings — combining reduced idle labor, eliminated third-party processing fees, and fewer rush freight charges — totaled approximately $340,000.

    Prairie Ag has since expanded their use of Brunswick's tube laser service to include prototype runs, letting them test new equipment designs without committing to a full production order.

    Finished assemblies
    Finished tube assemblies ready for shipping
    BOS ordering
    BÔS order confirmation on the shop floor
    Delivery truck
    Next-morning delivery at Prairie Ag